CASA Wheelchair Ramp workday - Event Date: 13 December 2014 |
Post Reply |
Author | |
alabamatoy
Admin Group I dont work here anymore... Joined: 16 February 2004 Location: Signal Mountain Status: Offline Points: 9369 |
Post Options
Thanks(0)
Posted: 17 November 2014 at 3:40am |
There are two type of effort CASA needs:
Delivery of materials can take place a day or two before the project, or it can be JIT (just in time!) the morning of the build. We do not want to leave the materials onsite for too long as the probability that they get pilfered will rise with the time the materials sit onsite. If you are available to support either role 1 or role 2 noted above on this date, please reply to this post and tell me which role!!
|
|
"If you didnt buy your 1st gen 4Runner new, then YOU are a newbie!!"
BRC Life Member |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |